Spårväxlar i vinterförhållanden
During the period 2009-2011 Sweden had two really hard winters with lots of snow. The result was train delays because of snow in the railway switches. The purpose of this work is to highlight the problems that arise around switches during winter and to propose methods to reduce these problems. The switch has a core function of the railway system and must therefore work properly. Switches are also