Commissioning status of the chopper system for the Max IV injector
The MAX IV facility in Lund, Sweden consists of two storage rings for production of synchrotron radiation, and a short-pulse-facility (SPF). The two rings are designed for 3 GeV and 1.5 GeV, respectively, where the initial beam commissioning of the former has recently been completed, and commissioning of the latter was started in September 2016. Both rings will be operating with top-up injections