Concrete strategy for the Oresund Tunnel
This paper gives a short review of the most requirements for the concrete to be used for the 3.510 m long immersed tunnel from Amager (outside Copenhagen Airport) to an artificial double island south of Saltholm (in the middle of Oresund). The basis for the requirements is shortly commented.
